Kinetic Hydro-electric (Patent Pending)


  • Power can be dictated by the size of TANK / PIPE DIA & Ndb mechanism.
  • Doesn’t require huge land for “Penstock”.
  • Weather is not an important aspect.
  • Ability to locate the power plant nearer to substation which can significantly reduce the CAPEX for transmission line.

Technology licensed by Nazrie (Malaysia) Sdn Bhd
 
Green